| Sign In | Join Free | My brakesband.com | 
              
  | 
      
Brand Name : ChenMu
Model Number : CM-S5050-TypeIV-S -16H1
Certification : RoHS
Place of Origin : Zhejiang,China
MOQ : 2000 PCS
Price : Negotiable
Payment Terms : T/T, Western Union, MoneyGram
Supply Ability : 10000pcs/per week
Delivery Time : 3-5 working days
Packaging Details : Cartons
Light source : LED
Item type : Street Lights
Lamp luminous efficiency(lm/w) : 130
Color temperature(cct) : 2700K-6500K,3000-7500
Led light source : SMD3030
Application : ROAD,highways,parks,Square
Type IV-S Eco Friendly LED Optics Lenses With Single Or Multiple LEDs Modules
Quick detail
| Product Name: | CM-S5050-Type IV -16H1 | Beam Angle: | Type IV | 
| Efficiency: | 93% | Material: | PC | 
| LED Chips: | 3030 | Dimmable: | L50*50mm | 
| Accessory: | SMD LED+PCB+outer shell | ||
| Application: | Flood Lighting,High Bay Lighting,Street Lighting ect. | ||
Description
Specifications
| Product Name: | CM-S5050-Type IV-16H1 | 
| Beam Angle: | Type IV | 
| Efficiency: | 93% | 
| Material: | PC | 
| LED Chips | 3030 | 
| Size: | L50*W50 mm | 
| Accessory: | SMD LED+PCB+outer shell | 
| Other Light Distribution: | 30°/60°/ 90°/TypeII-M/TypeIII-M/TypeIV-S/TypeV ect | 
| Application: | Flood Lighting,High Bay Lighting,Street Lighting ect. | 
| Quatity Guarantee: | If you receive a defective item, please email us a picture of the defective part. We will arrange for a reshipment or refund to you.  |  		
| Main Maket: | Europe,South America,North America,Asia ect | 
Shipping and Delivery:
Trade Terms:  |  			EXW , FOB , CNF , CIF | 
| Payment Terms: | T/T , PayPal , Western Union, Moneygram | 
| Delivery time: | 2-3 working days for samples order, 5-7 working days for bulk order | 
| Shipment Terms | By Sea, By Air, By Express like DHL, Fedex, UPS, TNT, etc | 
IES

Drawing

Notices
FAQ
1) Can I have a sample order?
  
A: Yes, we welcome sample order to test and check quality.
  
Mixed samples are acceptable.
3) What is the lead time?
  
A:Sample needs about 3-5 days prepared; mass production time needs 7-10 days normally.
| 
                                             | 
                
                        Practical SMD3030 LED Optics Lenses , 50x50mm Square LED Module Images |